Production Update 38

Normalcy is starting to return as I close out a few projects and return from traveling. It was a fun and exciting month, I was at a few different studios working with a lot of great people. but I would be lying if I said I didn’t miss my own bed and some home cooked food after a month of hotels, airplanes and eating out. I also took some time off last week to get some rest and to take a break from the computer but I was back in action this week.

The first item I wanted to get done was getting a rough draft of the prologue completed so I could get music started on it. That has been done, the composer has a draft of the prologue and will be working on creating a track to go under the voice over.

With a rough draft sent off for music, I now shifted my attention to finishing up some of the artwork and compositing. I have inked all 5 of the drawings this week and have started coloring them as well. I am confident I can get them all completed for next week as well as start compositing the drawings into the shots they need to be in. I am looking forward to getting back into After Effects and composite these shots to see how they look.

Progress/Status:

Prologue:

Overall: 55:00  of 1:20:00
Storyboards: DONE
Drawing: 5/5
Inking/coloring/shading: 3/5
Animating/Compositing: In Work
Audio: In Work/ VO is done

Episode 1:
Storyboards: DONE
Drawing: DONE
Inking/coloring/shading: DONE
Animating/Compositing: In Work
Audio: NONE

Episode 2:
Storyboards: DONE
Drawing: 3/20pages
Inking/coloring/shading: 0/20
Animating/Compositing: NONE